This handbook integrates all operational, quality, culture, and compliance documentation for the BOHO ALTA WW Laboratory. Organized across 10 process categories with 44 framework items.
11 additional items have been identified as critical operational gaps and are marked throughout this handbook as + NEW / RECOMMENDED. These include: Raw Material Tracker, Vendor Master List, Returns & Refund SOP, Failed Delivery Log, Equipment Maintenance Log, Shift Roster, Leave Management Tracker, Employee Onboarding Checklist, Non-Conformance Log, Customer Database, and Product Catalog.
| # | Stage | Target |
|---|---|---|
| 01 | Production Trigger | Same day / 1–2 hrs |
| 02 | Material Availability Check | Same day / 2–4 hrs |
| 03 | Raw Material Intake | Same day on arrival |
| 04 | Material Inspection & Storage | Same day to 24 hrs |
| 05 | Production Planning | Daily / before shift |
| 06 | Work Order Release | Same day as planning |
| 07 | Making / Fabrication | Per SKU standard |
| 08 | In-Process QC | Same shift |
| 09 | Finishing | Per SKU; curing planned |
| 10 | Final QC | 12–24 hrs after finishing |
| 11 | Packaging & Labeling | Same day to 24 hrs |
| 12 | Dispatch Readiness | Same day before cut-off |
| 13 | Delivery / Installation | Per dispatch plan |
| 14 | Closure & Record Update | Within 24 hrs of delivery |
- 01Verify order is confirmed and approved.
- 02Confirm product specifications are complete (SKU, quantity, dimensions, material, finish, delivery date).
- 03Confirm payment or internal approval status.
- 04Create or update production brief with all required inputs.
- 05Send production trigger to Production Coordinator.
- 01Review bill of materials or practical material list from production brief.
- 02Check available stock of primary materials, accessories, finishing items, and packaging.
- 03Identify shortages, substitute options, or urgent procurement needs.
- 04Reserve available stock against the production order in the inventory system.
- 01Receive material from vendor or internal transfer.
- 02Match received quantity against the purchase order or requisition document.
- 03Check basic physical condition upon receipt.
- 04Record material receipt date, vendor name, quantity, and reference number.
- 05Label and segregate material by category in the storage area.
- 01Inspect each batch against the criteria above.
- 02Separate material into three categories: Approved, Conditional, and Rejected.
- 03Update stock records accordingly.
- 04Store approved items in designated storage zones.
- 05Tag fragile, premium, or urgent-use material appropriately.
- 01Prioritize jobs by promised delivery date, complexity, and strategic importance.
- 02Group jobs by product type, finish type, or maker skill where efficient.
- 03Assign estimated start and finish dates per job.
- 04Allocate makers, stations, and tools to each job.
- 05Flag dependencies such as drying time, outsourced work, or custom approvals.
- 01Print or digitally issue the work order with all required fields.
- 02Attach sample image or design reference where needed.
- 03Release raw materials from inventory against the job.
- 04Obtain supervisor acknowledgment of work order receipt.
- 01Collect issued materials from inventory against work order.
- 02Start fabrication, crafting, or assembly per approved specifications.
- 03Maintain stage updates on job card in real time.
- 04Minimize wastage and record excess loss if any occurs.
- 05Escalate defects, material shortages, or specification ambiguity immediately to Supervisor.
Correct dimensions · Structural accuracy · Clean workmanship · Alignment / balance · Material consistency · No major defects
✓ Pass
⟳ Rework Required
✕ Reject
- 01Inspect the partially completed unit at the appropriate mid-stage.
- 02Mark disposition: Pass, Rework Required, or Reject.
- 03Record issue type and assign rework owner if rework is required.
- 04Re-inspect and re-record after correction is completed.
- 01Surface smoothening and cleaning.
- 02Apply paint, stain, polish, coating, fabric finish, or protective treatment as applicable.
- 03Attach accessories, pads, hardware, tags, or decorative elements.
- 04Allow full required drying, settling, or curing time per product standard.
- 05Protect finished item from dust, scratches, and handling damage during settling.
- 01Check correct product and quantity confirmed against work order.
- 02Verify no scratches, stains, chips, loose parts, or visual imbalance.
- 03Confirm packaging readiness and all special custom instructions are met.
- 04Assign disposition: Pass / Pass with Note / Rework Required / Reject.
- 01Verify approved quantity against dispatch note.
- 02Select packaging based on fragility, size, value, and transport mode.
- 03Add protective wraps, corner guards, cushioning, and moisture protection where needed.
- 04Apply SKU, order, customer, and destination labels accurately.
- 05Add care card, branding insert, or invoice copy as required.
- 06Mark as Fragile / Top Load / This Side Up where relevant.
- 01Verify packed quantity against dispatch note.
- 02Verify delivery address, route, customer contact, and installation schedule.
- 03Confirm payment and handover conditions are met.
- 04Confirm vehicle, courier, or manpower arrangement.
- 05Prepare delivery challan and handover note.
- 01Load goods carefully with physical checklist.
- 02Deliver to customer, project site, showroom, or warehouse.
- 03Obtain proof of delivery or installation sign-off.
- 04Report any damage, refusal, delay, or site issues immediately.
- 05Close delivery status in the production/dispatch tracker.
- 01Update job status to Completed in the tracker.
- 02Record actual completion date.
- 03Record variance from originally promised timeline.
- 04Record any rework incidents, wastage, or quality issues.
- 05Update sales, order, inventory, and delivery tracker.
- 06Flag learning points for process improvement and share in next review.
- →Visual appearance and surface finish
- →Weight accuracy and dimensions
- →Scent / texture integrity (candles, spa)
- →Labeling completeness and accuracy
- →Brand packaging compliance
- →Structural integrity — no loose parts
Each entry should capture: Batch number · Defect type · Volume affected · Responsible team member · Corrective action taken. Enables trend analysis and continuous improvement.
- Always follow approved designs & prototypes — no personal modifications without approval.
- Take time to polish, finish, and QC every piece before placing in storage.
- Label all products correctly with product code, date, and artisan initials.
- Use proper tools for each material — never improvise with the wrong tool.
- Don't pass any product to storage without QC Lead approval — no exceptions.
- Don't ignore defects (cracks, loose stitches, uneven wax) — reject or rework immediately.
- Don't skip finishing steps: sanding, glazing, trimming, and polishing are all required.
- Don't mix unapproved materials or shortcuts such as plastic fillers or synthetic dyes.
- Be punctual — work starts at 9:30 AM sharp, every single day.
- Complete daily batch targets and record all production in the logbook.
- Follow the step-by-step workflow: Raw Material → Production → In-Process QC → Final QC → Inventory.
- Respect deadlines — one delay in your step affects the entire order chain.
- Don't arrive late — your delay cascades through everyone's schedule.
- Don't leave tasks incomplete without properly handing them over to a colleague.
- Don't skip production log entries — undocumented work equals wasted effort.
- Don't prioritize personal side projects over your assigned BOHO work.
- Use only the allocated quantity of raw materials — measure carefully before use.
- Reuse and recycle waste: fabric scraps, clay shards, and wax leftovers all have value.
- Segregate eco-waste and non-eco waste into designated bins.
- Follow eco-packaging practices — avoid plastic unless absolutely necessary.
- Don't waste raw materials through over-cutting fabric or discarding usable clay.
- Don't dispose of scraps carelessly — all scraps must go to recycling bins.
- Don't bring non-eco packaging into the workshop (poly bags, Styrofoam).
- Don't waste energy — turn off kilns, heaters, and machines when not in active use.
- Keep your workstation tidy and organized at all times throughout the day.
- Return all tools to their proper racks after every use — no exceptions.
- Wear full PPE (gloves, aprons, masks) when working with dyes, wax, or kilns.
- Report any accidents, spills, or tool damage immediately to your supervisor.
- Don't leave sharp tools, needles, or cutters lying around unattended.
- Don't eat or drink at workstations — this risks spills and product contamination.
- Don't leave wax, dyes, or chemicals open or uncovered when not in use.
- Don't ignore or skip safety gear — it is mandatory and non-negotiable.
| Behavior | Level | Consequence |
|---|---|---|
| Ignoring QC checks or production deadlines | Warning | Formal warning issued |
| Unauthorized use of workshop materials | Disciplinary | Disciplinary action |
| Repeated neglect of cleanliness or safety | Penalty | Penalty applied |
| Ethics & Sustainability Training attendance | Required | Mandatory quarterly — all artisans & staff |
Action: Maintain and monitor.
Action: Identify root cause. Escalate if no improvement in 2 weeks.
Action: RCA required. Corrective action with owner and deadline.
Checklist
Track, measure, and score all 8 KPIs across the BOHO ALTA production framework. Use the traffic light system to signal performance. Complete the compliance column after each measurement cycle.
| # | KPI Name & Owner | Formula | Target | Frequency | Current Score | Status | Compliant? | Action Required |
|---|---|---|---|---|---|---|---|---|
| 01 | On-Time Production Rate Production Coordinator |
Jobs on-time ÷ Total jobs × 100 | ≥ 90% Flag <80% × 2 weeks |
Weekly | ___% |
Yes No |
___________________ | |
| 02 | On-Time Delivery Readiness Executive + Dispatch Coordinator |
Orders ready on-time ÷ Total dispatched × 100 | ≥ 92% Investigate every miss |
Weekly / Per batch | ___% |
Yes No |
___________________ | |
| 03 | Rework Percentage QC Executive + Workshop Supervisor |
Units reworked ÷ Total produced × 100 | ≤ 8% overall Alert if SKU >15% |
Weekly + Monthly trend | ___% |
Yes No |
___________________ | |
| 04 | QC First-Pass Rate QC Executive |
Units passing first QC ÷ Total inspected × 100 | ≥ 85% Below 75% → immediate RCA |
Weekly | ___% |
Yes No |
___________________ | |
| 05 | Material Shortage Incidents Procurement / Inventory Executive |
Count of jobs blocked by material shortage | ≤ 2 / month Zero tolerance repeats |
Monthly (per incident) | ___ incidents |
Yes No |
___________________ | |
| 06 | Average Job Cycle Time Production Coordinator |
Sum (QC Pass – WO Release) ÷ Jobs | Per SKU baseline Review monthly to refine |
Monthly per SKU | ___ days avg |
Yes No |
___________________ | |
| 07 | Packaging Error Rate Packaging & Fulfillment Executive |
Orders with errors ÷ Total packed × 100 | ≤ 2% Zero for wrong-label errors |
Per batch / Weekly | ___% |
Yes No |
___________________ | |
| 08 | Damage-on-Delivery Rate Dispatch Coordinator + Delivery Team |
Deliveries with damage ÷ Total deliveries × 100 | ≤ 1% Above 2% → logistics review |
Monthly | ___% |
Yes No |
___________________ |
BOHO-PRD-001 · Version 1.0
Internal Use Only · 2025
44 Framework Items · 10 Categories